2022 Latest Design Napkin Folding Machine - Insole Paper Board Making Machine – Dingchen
2022 Latest Design Napkin Folding Machine - Insole Paper Board Making Machine – Dingchen Detail:
| 1.Raw material | OCC,Waste papers |
| 2.Output paper | Insole Paper Board |
| 3.Output paper thickness | 0.9-3mm |
| 4.Output paper width | 1100-2100mm |
| 5.Wire width | 1350-2450 mm |
| 6.Capacity | 5-25 Tons Per Day |
| 7. Working speed | 10-20m/min |
| 8. Design speed | 30-40m/min |
| 9.Rail gauge | 1800-2900 mm |
| 10.Drive way | Alternating current frequency conversion adjustable speed, sectional drive |
| 11.Layout | Left or right hand machine |
Waste papers →Stock preparation system→Cylinder mould part→Press, cutting and paper off-loading part→Natural dry→Calendering part →Edge trimmed part→Printing machine
Requirements for Water, electricity, compressed air:
1.Fresh water and recycled use water condition:
Fresh water condition:clean,no color,low sand
Fresh water pressure used for boiler and cleaning system:3Mpa、2Mpa、0.4Mpa(3 kinds) PH value:6~8
Reuse water condition:
COD≦600 BOD≦240 SS≦80 ℃20-38 PH6-8
2. Power supply parameter
Voltage:380/220V±10%
Controlling system voltage:220/24V
Frequency:50HZ±2
3. Compressed air
Air source pressure:0.6~0.7Mpa
Working pressure:≤0.5Mpa
Requirements: filtering、degreasing、dewatering、dry
Air supply temperature:≤35℃
Product detail pictures:
Related Product Guide:
Dependable high-quality and fantastic credit standing are our principles, which will help us at a top-ranking position. Adhering to your tenet of "quality very first, client supreme" for 2022 Latest Design Napkin Folding Machine - Insole Paper Board Making Machine – Dingchen , The product will supply to all over the world, such as: Afghanistan, Paraguay, azerbaijan, We've got sufficient experience in producing products according to samples or drawings. We warmly welcome customers from home and abroad to visit our company, and to cooperate with us for a splendid future together.
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.






